Ochrefield Tower (synthetic)
Construction, superstructure, month 14 of 26 · AE-DU · entity: Ochrefield Contracting LLC (synthetic)
V0 28.9% · V1 21.8% · V2 14.2% · V3 35.1%
Site medians do not add up to the total, because each comes from its own joint run.
Total by period
2026-Q2 has no earlier period with the same criteria, so there is no comparison. Its band is shown alone.
Dotted: 2026-Q1 as first reported, before the restatement. Band colour shows the weakest tier present.
2026-Q2 · weakest V0
V0 28.9% · V1 21.8% · V2 14.2% · V3 35.1%
Every figure
11 figures
2,400 nr · Activity only: no carbon figure · One source’s word (V0)
Not known, because No factor for an activity-only record
Evidence by source
Documents carry 56% of the carbon. 6 of 13 figures rest on one independent party.
What is missing and what it would buy
Best next jobs (estimates)
4 jobs, widest narrowing first.
| Job | Band width The distance from P5 to P95. | Tier A tier says how the evidence behind a figure was obtained. It is evidence quality, not assurance. | Holder | Action |
|---|---|---|---|---|
| Aluminium cladding | 163.1 to about 57.0 t | V0, stays | The plant (synthetic) holds the production record | Ask for the production record |
| Core-wall pour | 106.3 to about 18.0 t | V3, stays | The plant (synthetic) holds the same record | Ask for the production record |
| Concrete, Ochrefield Tower | 76.3 to about 21.0 t | V1, stays | Dunebay Readymix (synthetic) holds the record | Ask for the production record |
| Generator diesel | 20.1 to about 16.0 t | V2, could reach V3Decide the finding, then arrange a witnessed tank dip. | You or a reviewer decide the finding; the site engineer arranges the dip | Decide the finding |
Findings and asks
1 open findings · 3 open asks
- Open the figure
O. Haddad (synthetic) answered you on generator diesel
You or a reviewer can decide
- Open the figure
Generator diesel at Ochrefield Tower (synthetic): two sources are further apart than their combined uncertainty explains
You or a reviewer can decide
- Ask for it
Ready-mix concrete: no weighbridge reading arrived for 2026-Q2
Facilities (O. Haddad’s team, synthetic) holds it
- Ask the supplier
Cement bags at Ochrefield Tower (synthetic): only the supplier’s word, so V0
Dunebay Readymix (synthetic) holds it