Demonstration. Synthetic data only.
Ochrefield Contracting (synthetic)
Ochrefield Contracting (synthetic) · Dubai

How Artho works for you

What the seven stages are, why every figure carries a band and a tier, and what the words mean.

Return to your next job

The seven stages

Every period moves through them in order

  1. 1

    Declare

    Say what the report covers: sites, period, boundaries and the criteria set.

  2. 2

    Bring in

    Add the files, readings and counts you already hold. Nothing is retyped.

  3. 3

    Ask

    Where a gap remains, ask the person who holds the answer, with a date.

  4. 4

    Reconcile

    The engine tests sources against each other, against their combined uncertainty.

  5. 5

    Report

    Admitted figures form the report, each with its band and tier.

  6. 6

    Review

    A second person decides findings and reviews conclusions.

  7. 7

    Share

    The lead shares the issued report, only the sections each recipient is granted.

Why bands and tiers

A single number hides how much is known. Artho shows the median with its P5 to P95 band, so you see the range the true value is likely in, and its tier, so you see how the evidence was obtained. More evidence narrows a band or raises a tier. Artho has no single score of its own.

One source’s word (V0)Two parties agree (V1)Measured (V2)Measured and confirmed (V3)

Glossary

Median
The middle estimate of a figure.
Band (P5 to P95)
The range the true value falls in about 90% of the time.
Tier
How the evidence was obtained, V0 to V3. Evidence quality, not assurance.
V4-L, V4-R
Limited or reasonable assurance. Only from a practitioner’s signed report with standard, level, practitioner, period and criteria set.
Proxy
A factor from a wider region standing in for a missing regional one. Band widened, tier capped.
Held out of filing
Admitted to the report but not yet able to be filed, with the reason stated.
Combined uncertainty
The uncertainty of two sources taken together. Divergence is tested against it, never a fixed percentage.
PROPOSED
A value suggested by engineering, owned and ratified by the assurance partner.
Supersede
Evidence is never edited. A correction is a new record; the old one stays, struck through.
Advisory
Weighting, scores and scenarios. Kept in its own frame, never mixed with reporting.

Keyboard shortcuts

Ctrl K
Find a figure, gap or document
?
Show keyboard shortcuts
Esc
Close a panel or dialog