Skip to content
Demonstration. Synthetic data only.
rthorthoOchrefield Contracting (synthetic)

Your work

HomeFindingsReviewsImprovements

The numbers

DashboardFiguresCoverageReports and review
RailsAll railsSite visionSensorsMotors and machinesHeatDocuments and systemsGet your data

Bring data in

Add data

Internal decisions

Advisory
HelpMethod library
Ochrefield Contracting (synthetic) · Dubai

Mixed construction waste at Ochrefield Tower; what is possible (synthetic)

Measured and confirmed (V3)Can be filed
Geography: AE-DU
Ask a colleague to review Conversation: Not switched on yet Chain of evidence
P5 · 5.90P95 · 13.4
8.90 tCO2ebetween 5.90 and 13.4 about 90% of the time (P5 to P95) The median is the middle estimate. The band runs from P5 to P95: the true value falls inside it about 90% of the time.Measured and confirmed (V3)A tier says how the evidence behind a figure was obtained. It is evidence quality, not assurance.

Why this tier

What is possible: your own weighbridge and transfer notes agree, z 0.415. Joint mass 501.4 t (480.2 to 523.5), GSD 1.0266, V3.

How to move this up

The own weighbridge is already fitted. Ask for the two destination transfer notes.

Who to check it with

Quillmere Recovery Yard (synthetic), for the destination records.

What could we add

The weighbridge is already fitted; a camera counts skip lorry departures, not mass.

Chain of evidence

The factor has its own band. The headline is the supplied engine seed, never recomputed from these illustrative inputs.

Quantity

  1. 501.4 t (480.2 to 523.5), GSD 1.0266, V3, what is possible
  2. Own weighbridge and transfer notes agree, z 0.415
  3. 96 camera departures: a count, not a weight

Factor

  1. Factor 21.4 kgCO2e per t, GSD 1.28; geography AE-DU

Where it comes from

  • Your weighbridge (synthetic) · primary recordWeighbridge readings · 2026-Q2 · Your own weighbridge
    498.7 t (474.8 to 523.6, P5 to P95), GSD 1.03 · Measured (V2)
  • Quillmere Recovery Yard (synthetic)94 transfer notes · 2026-Q2 · Kept as receivedTwo destination transfer notes are not held
    512.4 t (465.6 to 564.1, P5 to P95), GSD 1.06 · One source’s word (V0)

Set aside

  • 96 skip lorry departures on camera: A count, not a weight; not added to the mass.
  • Instrument slot: held
  • Practitioner slot: empty. No assurance engagement is recorded for this period.

What was added

  • 94 transfer notes: 512.4 t, GSD 1.06Quillmere Recovery Yard (synthetic)Rail R1, Documents
  • Your own weighbridge: 498.7 t, GSD 1.03YoursRail R3, Sensors
  • 96 skip lorry departures; a count, not a weightYoursRail R4, Site vision

What should we add next?

Pick something you could add and whose it would be. The answer is the engine’s.

Nothing is picked yet.

Band over time

Not known, because this figure has only one computed band this period.

For auditors
kgCO2e
8,900 (P5 5,900, P95 13,400)
GSDs
Weighbridge readings 1.03 · 94 transfer notes 1.06 · factor 1.28
Factor
FACTOR-12, geography AE-DU
Verdict
concordant
z
0.415 against 2.58, PROPOSED, owned by the assurance partner
Criteria
CS-GROUP-2026.v1, PROPOSED, not ratified

All figures

HomeFiguresFindingsReviews

Monthly change review

Not known, because monthly results are not supplied.

The engine has supplied a quarterly figure, not monthly values or a paired difference band. A quarter cannot be split into invented months.

No monthly jump is asserted. This is not clearance to file; existing findings and close blockers still apply.

Edit with