Skip to content
Demonstration. Synthetic data only.
rthorthoOchrefield Contracting (synthetic)

Your work

HomeFindingsReviewsImprovements

The numbers

DashboardFiguresCoverageReports and review
RailsAll railsSite visionSensorsMotors and machinesHeatDocuments and systemsGet your data

Bring data in

Add data

Internal decisions

Advisory
HelpMethod library
Ochrefield Contracting (synthetic) · Dubai

Masonry blocks at Ochrefield Tower (synthetic)

One source’s word (V0)Can be filedProxy
Geography: AE-DUProxy · Regional evidence is limited; band widened No factor exists for this region, so a wider region’s factor stands in. The band is widened and the tier capped.Geography fallback · depth 1
Ask a colleague to review Conversation: Not switched on yet Chain of evidence
P5 · 2.00P95 · 5.20
3.20 tCO2ebetween 2.00 and 5.20 about 90% of the time (P5 to P95) The median is the middle estimate. The band runs from P5 to P95: the true value falls inside it about 90% of the time.One source’s word (V0)A tier says how the evidence behind a figure was obtained. It is evidence quality, not assurance.

Why this tier

One source’s word (V0): regional proxy limits evidence quality.

Capped because a regional proxy factor is used. Regional evidence is limited; band widened

How to move this up

Add a second, independent record of the same quantity.

Who to check it with

O. Haddad (synthetic), site engineer at Ochrefield Tower.

What could we add

A supplier statement or a meter reading for the same weeks.

Chain of evidence

The tier describes only the quantity.

Quantity

  1. 1,320 nr from the records listed below

Factor

  1. FACTOR-03: 2.424 kgCO2e per nr, geography AE-DU, PROXY with its band widened

Where it comes from

  • Ochrefield Tower team (synthetic) · primary recordDocument · 2026-Q2 · Kept as received
    1,320 nr, GSD 1.10 · One source’s word (V0)
  • Instrument slot: empty
  • Practitioner slot: empty. No assurance engagement is recorded for this period.

What was added

  • Delivery notes, 22Sandmarten Block Co (synthetic)Rail R1, Documents
  • Pallet estimates, CAM-YARD-01YoursRail R4, Site vision

What should we add next?

Pick something you could add and whose it would be. The answer is the engine’s.

Nothing is picked yet.

What is missing to clear V3

  • Held: an instrument reading, CAM-YARD-01 pallet estimate
  • Not held: a second party who independently agrees, A signed delivery docket at the bay

The cheapest second party: Sandmarten Block Co (synthetic), who already produce a docket. With both, this figure could clear V3.

Band over time

Not known, because this figure has only one computed band this period.

For auditors
kgCO2e
3,200 (P5 2,000, P95 5,200)
GSDs
Document 1.1 · factor 0.3
Factor
FACTOR-03, geography AE-DU
Verdict
concordant
z
Not computed, because there is one record
Criteria
CS-GROUP-2026.v1, PROPOSED, not ratified

All figures

HomeFiguresFindingsReviews

Monthly change review

Not known, because monthly results are not supplied.

The engine has supplied a quarterly figure, not monthly values or a paired difference band. A quarter cannot be split into invented months.

No monthly jump is asserted. This is not clearance to file; existing findings and close blockers still apply.

Edit with